Seattle Office Building Sets New Standards in Sustainability

Posted on 25 April, 2013 by Neil Bird

Since 2010 new regulations have required a 25 per cent reduction in carbon emissions from new buildings in the UK. These rules are set to tighten further with the government targeting zero carbon emissions for residential new-builds by 2016 and 2019 in the case of commercial property.

This is certain to have an impact on the market with investment in low/zero carbon buildings outstripping that in older, energy inefficient properties. This, in turn, is likely to be reflected in values and rental returns as 2019 draws closer and the market for sustainable property heats up.

Given this emerging market it is perhaps appropriate that the developers of a Seattle office building, billed as the greenest in the world, chose this week’s Earth Day for the grand opening.

The Bullit Center is a six storey, super- efficient, office block that hopes to be the largest structure yet to qualify for the Living Building Challenge. This is the world’s most demanding set of sustainable standards, requiring a new-build to meet the following requirements.

  • The building cannot contribute any waste to the environment
  • It can only use as much water as it produces
  • It can only be powered by as much energy as it can generate
  • All heavy construction materials must come from within 300 miles of the site
  • None of the materials can contain any ‘red listed’ chemicals

The challenge is based on actual performance, as opposed to modelled or anticipated performance, meaning that the building must prove itself over the course of a year. In order to meet the requirements the Bullit Center is solar powered and has floor to ceiling windows providing natural light throughout the working day to over 80 per cent of the 50,000 sq ft building.

These windows also act as the Bullit Center’s ventilation system, opening and closing automatically to adjust to temperature changes both inside and outside. But the commitment to the environment doesn’t end there. Tenants must adhere to a strict power quota and face a surcharge for overuse.

They are also encouraged to use the stairs rather than the lift. In addition the Bullit Center does not have a car park, although there is space for bicycles. Instead tenants are provided with public transport information.

While some might expect these strict requirements to deter potential tenants, Denis Hayes, CEO of the Bullit Foundation, reports that the property is already 80 per cent occupied and he expects it to be fully let by the summer.

Hayes believes that future demand will lead to developments like the Bullit Center becoming the norm over time.

“I really genuinely believe that during my daughter’s lifetime, this sort of building is going to be commonplace,” he said.




Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.


Recent Posts

Interest Rates Impact on Commercial Property

Commercial Property Investment Outlook for 2023

The best places to stay on the Riviera

The latest property data has identified Newquay as the fastest property seller’s market in the UK

Investing in your garden can increase your property’s value

French Riviera temping high-end homebuyers

How can the ownership rights of my commercial property impact a business sale?

Should I incorporate virtual property viewings permanently?

Investment expected to increase across Asia-Pacific in 2021

UK property industry slows as the conclusion of tax break looms

BNP Paribas cautioned investors on Friday as debt-trading bonanza that increased its earnings this past year

Over 300,000 property purchases fell through in 2020 – we show the most frequent motives and the best way to get your house sale back on track

House Prices in the Capital Surpass £500,000

Optimism from the Bank of England’s chief economist

The most expensive commercial properties.

Businesses operating from shared premises will miss out on grants